| Darien, CT chassis make the turn from the chassis line to the aerial line. All of the aerial components will now start to be installed.
The super structure has been set on the chassis. The jack beams have also been set on the chassis and the new torque box is ready for installation.
The body side packs have been fabricated and are in line for body work and paint.
The base section of boom and its components have been also been painted and will be assembled shortly.
Check the "In Production" tab for more photos on this unit.
http://www.hudsonvalleyfire.com/content/production |